1920m3 of Concrete Delivered for New Windfarm Project
20/10/2023

Concrete supplied by NMSB being pumped into a base
We are very proud to have supported Knights Brown with their project at the new windfarm in Wareham, by supplying and delivering the concrete required for the bases, creating a strong foundation for the wind turbines.
This project has been a major focus for us over the past few months, and we are pleased to share that the four bases have now been completed. Each base required an impressive 480m3 concrete, which needed to be delivered in consecutive loads over one day, delivered from two plants using 15 vehicles, equalling a total of 1920m3 concrete across all four bases.

Finished base for a wind turbine
Luke Watts, Commercial Manager comments "We are very proud of our BSI-accredited concrete, and our ability to deliver consistent, high-quality product across four plants, which enables us to ensure our customers receive the same service, no matter where their project is located across Hampshire and Dorset."
Whether it is civil engineering, house building, or infrastructure, we can produce concrete in large or small quantities to suit the DIYer or national construction company.
We're incredibly proud of what we have accomplished with this project and look forward to seeing the benefits it will bring to the local community and the environment as a whole. We would like to thank all our team who have been involved in ensuring seamless delivery and coordination on-site.